Estimator and Field Superintendent Must Be Joined at the Hip
- It is quite common in concrete construction for there to be continuous conflict between the estimator (the office man) and the field superintendent (the field guy). In these cases everything that goes wrong on the job site is blamed on the estimator: Not enough labor in the budget, the concrete was not calculated properly, not enough base was figured….
You will need Adobe Reader to view this Guide.
Download the free Reader
from Adobe
- download rank:
- #55
- email rank:
- #54
Additional Resources
The Concrete Network Concrete info, pictures, products and job referrals www.ConcreteNetwork.com
Landscaping Network Landscape design ideas and pictures www.LandscapingNetwork.com
Decorative Concrete Resources
Concrete Countertops Articles, photos & designs about concrete counters www.Concrete-Countertops.org
Concrete Floors Photo galleries and information www.Concrete-Floors.org
Stained Concrete Hot trends, photos, videos and articles on concrete staining www.ConcreteStained.com